How To Plot Bell Curve Chart
Dec 21, 2010I need to plot a bell curve graph .
*My Asp.net compiler doesn't have any chart component . If anyone has simple coding on tat will be the best
I need to plot a bell curve graph .
*My Asp.net compiler doesn't have any chart component . If anyone has simple coding on tat will be the best
I have X and Y data columns coming from database.
I have to show scatter plot chart with Linear, Exponential, Log, power using asp.net chart control.
How to do that?
My project will have a reporting ability with more that 2 Y axes.
It would be ideal to manage doing something like this, but using MS Chart.
I'm developing an asp.net web site to work on mobile devices. Is going ok and works fine with android and iphone. I've no got around to testing it with blackberry in my balcberry curve. When i first tried everything looked good b ut then i noticed that some od the autopost back on dropdowns etc did not work. Some research time later i turn out out that by default that blackberries do not support this and that I need a Blackberr.browser file to allow that type of functionality to work. I following this link...http://www.codeproject.com/KB/aspnet/BlackberryASPNET.aspxAfter doing this my blakberry will not load the site at all, i just get connection timeouts. So i tried removing the blackberry.browser file, read loading the assembley in an attempt to get back to where is was, but still the site will not connect. I've refreshed iis, recycled app pools and even rebooted. I have a QA site on another box that the blackberry will connect to, but my development machine it does not like anymore
View 1 RepliesI've been thinking about starting to work with AJAX because it seems easy to use things like the update panel. I also want to use a modal popup. I know that JQuery has some really stuff and I want to use it eventually. I want to take the path of least resistance for now though.
there seems to be some overlap in what the two technologies offer. There are similar things offered in both of them. I think I have to use AJAX for the partial page updates though.
How is the learning curve for JQuery compared to AJAX?
I have to create a web application that allows you to create specific XML documents. To generate a document, the user must be able to fill out fields that will be the XML content, using dropdown lists, text input fields, calendar controls ... Some fields will be validated. use some default values (text, new GUID, current date ...) add or remove sub nodes. The minimum an maximum number of nodes will be validated. All fields, relations and validations should be configurable by using config files. I have an idea of how to implement this in a homebrew MVP or MVVM pattern way.
Now I wonder if MVC 2 can help me enough to justify the learning curve. (MVC 3 is not an option, as my client still uses VS2008.) In two weeks I should have a working application. It is for internal "power user" use, so it doesn't have to look too fancy, but the main concept and functionality should be waterproof. My background: I have many years of experience with Win Forms developement and basic knowledge of ASP.NET (did some smaller apps with it).
How difficult is it going to be for me to pick up ASP. I dont know any coding besides basic HTML.
My end goal is to create a site with a form that will be linked to a database. The user entered information will pull data and display it to them.I have the SQL query, I just need to write the sit
can any show me the code or url that can help me to come up with code that can be displying normal distribution curve when values are submitted?Using Csharp.Net
View 1 RepliesSqlConnection myConnection = new SqlConnection("user id=wanjames; password=2011Janu; Trusted_Connection=yes; Data Source=WMBCEXEQTW703Z7\SQLEXPRESS; Database=PreTradeAnalysis");
View 1 RepliesI am creating a plot dynamically and want to embed the zoom feature to it so that small details could come to notice.
Is there any feature through which i can add a magnifying glass too may page or any other solution is desirable.
I would like to know how can I plot the data to a asp.net page with someting like MS outlook calendar.
View 4 Repliesi have created a program which saves login and logout time for a project.there may be more 2 login for a same project.i need to store the total working time for a particular project from all login/logout time.then for the same date there may be more than one entry.Ex:
Project name: Test
User name:
Login time:
Logout time:
Total Time: logout-login
Date:date of login
this is a format of table in database..more than one user will work for the project.there may more than one entry for a day by different users for same project.i need to put a chart for this table with date in x axis and total working time for that date in y-axis.How to calculate the values for this constraints
I'm creating a form that sends a data set into an XY scatter plot. I have a report and reportviewer set up correctly, however my chart will not adjust the vertical position of the data points! They're tied to the table below (and have data labels), however when they get plotted they're always right on the x-axis.
View 1 RepliesI have 150K records of X and Y columns and I am trying to draw a chart for FinanicalFormula. It is taking time to create chart for ever. It is not throwing error also.
Chart1.DataSource = dtChart
' Data bind to the selected data source
Chart1.DataBind()
Chart1.ChartAreas(0).RecalculateAxesScale()
[Code]....
control is coming out from these all line in debug. after that page taking to load data on the graph.
I want to create a google maps that it can Calculate Distance, Travel Duration, draw (plot) Route between two locations and display Directions. Now I want to hide Directions Panel.
View 1 RepliesI have an issue in using dot net chart control. In chart last column is not completely shown which give bad appearance and on right side of chart it looks like TickMark are enabled. I set MajorTickMark of AxisY2 disabled but still tick marks on right side.
View 2 Replieshow to freeze the x axis of the chart control in ms chart? need to use because data displayed at large amount that is scrollable.
View 1 RepliesI have a drop downlist,and next to it there is an MS bar chart.i want to change the datate of the MS chart ,once the user selects another year from the dropdownlist.
When the page loads ,the chart displays the default year(2011) and it works.The problem is that is does not change the data when you select another year from the dropdownlist.
Am I going mad/blind? Probably a combination of the two.
How does one go about removing the data labels from a pie chart with the new chart control in .net 4?
I can get these to display as tooltips absolutely fine, but ultiamtely I'd like the labels not to be present as it looks rather busy.
I've searched previous answers and seen code behind resolutions but surely there must be some sort of code infront option to turn these labels off?
I am using MS Chart control (3.5), and have a requirement where I need to display 2 pie charts. The datapoints for the pie charts is set programatically. My doubts are as follows:
1. Can I display both the pie charts in a single chart control and area, or do I have to use two controls? (Currently I am using two controls)
2. How can I maintain the same size for both the pie charts? This is my main concern, since the pie sizes keep changing, depending on the number of datapoints. I tried using custom properties like "MinimumRelativePieSize", but it's not working.
i'm trying to create a stacked bar chart on a vb web form using vs2010.My data source returns:
Error in Functionality Awaiting on Supplier
1IMT IssuesmActive6
IMT Issues,Awaiting on Supplier
2,IMT Issues,Awaiting on User 4
IMT Issues Closed 120
Login / Password Active
But I can't get this into a stacked chart. I know I must have to do quite a bit of work declaring what the series are and soforth, or having a different dataset but can't find any documentation on it.A link to some documentation or an example of a stacked chart from an sql datasource would be much appreciated.
I started using the awesome chart controls with my asp.net apps recently and so far they've been nothing short of breath taking. Right now I have a weird problem, on the first load of my page, the chart control appears correctly and the tooltip is correct, however, when I update it with new data, the chart displays correctly, but the tooltips are for the previous set of data.
I hope this makes sense. The first time I load the chart, the pie chart segments and tooltips are correct, after a partial postback (to get the new data), the pie chart segments are correct but the tooltips are for the previous data set.
Basically once the tooltips are set the first time, they can't be updated after that without a full page postback.
Here's how I set the tooltip:
[Code]....
Anyone else noticed this behaviour and have a work around?
Currently my only workaround is to check for a partial postback and not render the tooltip, which I'd rather not do as the tooltip display actual statistical data as opposed to the pie itself (which uses percentages).
Does anyone know how to explode a certain section of the piechart, which is part of microsoft chart controls?
View 5 RepliesI referred this link [URL] ...
In order to add pie chart into my website, but i want to remove black border and add % sign to the numbers showing graph and also want to set colours in pie chart based on my website theme.
I have 2 texbox and button when i type the address on textboxes it generates 2 google map using google map api and it is working fine.
I need to know how can calculate the distance between 2 addresses?