JQuery :: Reorder List - Change Order Of Divs And Upload New Order To Database
		
			Feb 7, 2011
				The AjaxToolkit has a ReorderList. I'm searching for a jQuery solution that does the same and found this page. I would like to change the order of divs (vertically) and upload the new order to the database (ajax).
	
	View 2 Replies
  
    
		
Similar Messages:
	
    	
    	
        Sep 2, 2010
        Im using a toolkit reorder list control. Im using LINQ2SQL. I have troubles making the order changes in the list to be updated to the database. This is my aspx code:
[Code]....
The drag and drop reordering works fine. In my  
[Code]....
But no changes to the order are visible. What is missing?
[Code...]
	View 2 Replies
   
  
    
	
    	
    	
        Nov 5, 2010
        I wanna save the order of my list to the sql server database in jquery drag & drop using asp.net c#. How can I do this?
	View 1 Replies
   
  
    
	
    	
    	
        Oct 21, 2010
        1 My DataTable Return following Data
Acct    Books    Annual
Acct    Books    Monthly
Acct    Tax    Income Tax
Admin    GH    Eqpt
Admin    Offc    Eqpt
Admin    Offc    Misc
Admin    Offc    Eqpt
[code]...
	View 10 Replies
   
  
    
	
    	
    	
        May 13, 2010
        I have a list box with 2 buttons (up and down) to determine the sort order. To move the items in the list box up or down I am using Javascript. I have a save button which is used to save the new order. However, I have an issue, in that when I have rearranged the order and press save, the order from the code behind is the same as the original order. My list box is:
<asp:ListBox ID="lstSortOrder" CssClass="uiControl" Height="200px" Width="700px"  runat="server"></asp:ListBox>
My code behind to save the new sort order is:
[Code]....
What so I need to do to capture the new listbox order?
	View 1 Replies
   
  
    
	
    	
    	
        Sep 5, 2010
        how to create a list order and unorder using database
	View 2 Replies
   
  
    
	
    	
    	
        Jan 23, 2010
        I have 5 hard corded texboxes in a page in a sequence with sequence Number . Now i want to add re-order /re-arraning functionaly .. but i can't use ajax reorder list because i have 5 hard corded texbox. how can i maintain the order in Insert/Update cases. And also suggest me control that i can use, another than ajax re-order list. coz i not using any list items i have hard corded items on the page.
	View 1 Replies
   
  
    
	
    	
    	
        Oct 22, 2010
        I have two table Order and Order Detail.
 What i need is i need to  bind last 10 Order in Gridview/details view with paging, and the same order detail also fetch from database and shown in another gridview.. if user click any oderNo in first Gridview/DetailView then i need to show Respective order detail in anther gridview..
without postback coz we already fetch 10 order with orderdetails from the database..and if user click next 10 orderNo using paging then again we need to load 10 orderNo with respective orderdeatils from database like this going on....as well as let me know how to take print of particular oder and order detail....?
	View 7 Replies
   
  
    
	
    	
    	
        Apr 24, 2010
        From my testing, it appears that the order of parameters for the UpdateParameters must match both the order of the bound fields on the form (asp:Formview), and the order of the parameters in the UpdateCommand. Is that correct? If so, why do the parameters have names if all that matters is the order? I tried both asp:ControlParameter and asp:Parameter. Maybe the more relevant question is why aren't the names used instead of the order, particularly for the form order?
So, given I display the Identity field (CID), and need that for the update, I cannot get the update to work without including it in the UpdateCommand. Of course, since it is an autonumber field in Access, I cannot actually set it. So, I had to add another field to the db (lngUpdateCID) that I could set. That can't be how it has to be done, but I could not figure out another way to do this.
The relevant code is below:
[Code]....
	View 23 Replies
   
  
    
	
    	
    	
        Jun 17, 2010
        I am buiding web application about news.My problem i need to change order of articles in that category.
Example :
+ Article A ----> position 1
+ Article B ----> position 2
+ Article C ----> position 3
+ Article D ----> position 4
+ Article E ----> position 5
+ Article F ----> position 6
All articles A -> F are inside category. Sometime i want to Article E is position 1, or article C in position 6 ...and so on Now i can't imagine what i have to do ?
	View 9 Replies
   
  
    
	
    	
    	
        Sep 7, 2010
        I need to order a list of items, by a string value...
e.g. 635, 955, 5820, 1010 should appear as 635,955,1010,5820, however it shows up as 1010, 5820, 635, 955 because it's a string and not an integer.
I cannot convert to integer, it must eb a string value. how this can be done simply using a string value?
	View 3 Replies
   
  
    
	
    	
    	
        Feb 17, 2010
        I have an ASP.NET web application that requires users to select their appropriate time zone so that it can correctly show local times for events.  
In creating a simple approach for selecting the time zone, I started by just using the values from TimeZoneInfo.GetSystemTimeZones(), and showing that list.  
The only problem with this is that since our application is primarily targeted at the United States, I'd like to show those entries first, basically starting with Eastern Time and working backwards (West) until I reach Atlantic time.
	View 2 Replies
   
  
    
	
    	
    	
        Feb 16, 2010
        i have an object's list where the object has 2 attributes, id and name. I have to order the list by the name of the objects
	View 6 Replies
   
  
    
	
    	
    	
        Feb 6, 2011
        I have a photo album gallery within my website and would like to allow users to sort the order of their photos within an album. After looking at very different ways I came across this example
http://www.west-wind.com/rick/photoalbum/demoMaui2006/Default.aspx?Admin=true which is exactly what I need.
The photo are stored in the uploads directory and details in the database. The images are displayed using the ListView as shown below:
[Code]....
I would like to rearrange the order of the photos; change the captions and/or delete the photos just like as in the example. 
So could someone please provide the steps that I need to follow in order to achieve the following:
 
Firstly to display the photos from the Photo table in the database (can use the above listView) Rearrange the order; change caption and/or delete the photo(s) Final to update the changes in the Photo table
I am new to programming, especially jQuery so could you kindly provide/explain the steps that I need to follow. 
	View 8 Replies
   
  
    
	
    	
    	
        Apr 13, 2010
        I have seen the MVC source code,and I found that the source register the Areas like this:
foreach (Type areaRegistrationType in areaRegistrationTypes)
{
AreaRegistration registration = (AreaRegistration)Activator.CreateInstance(areaRegistrationType);
registration.CreateContextAndRegister(routes, state);
}
so... how can I change the order without change the source code?
	View 2 Replies
   
  
    
	
    	
    	
        Mar 2, 2010
        I found this article on how to manipulate the rendering sequence of asp.net controls.: [URL]I placed some placeholders on the page to encapsulate the controls i want to move around. The problem is, that RenderChildren does render the controls without the html i placed into the placeholder like this:
<asp:PlaceHolder id="phOneToMove" Runat="server" Visible="true">
<tr>
<td><asp:Literal id="label1" Runat="server">Caption</asp:Literal></td>
<td>
<asp:TextBox ID="textbox1" runat="server"></asp:TextBox>
</td>
<td>
<asp:RequiredFieldValidator ID="validator1" Enabled="true" ControlToValidate="textbox1" runat="server" EnableClientScript="False" ErrorMessage="error"></asp:RequiredFieldValidator>
</td>
</tr>
</asp:PlaceHolder>
The controls are rendered without the tr and td around.How can I handle this? All I want is to change the order of the placeholders like in this example phOneToMove.
	View 2 Replies
   
  
    
	
    	
    	
        Oct 19, 2010
        can change the order in dropdownlist
DateTime NextMont = month.AddMonths(i);
	View 3 Replies
   
  
    
	
    	
    	
        Dec 15, 2010
        I've a webpage, which has a panel which contains three panels. What I would like to know, if there is a way to change the panel order..
[Code]....
And depending on some server variable reorder the panels.. And also, let the user drag and drop the panel in the desired position
	View 2 Replies
   
  
    
	
    	
    	
        Feb 10, 2010
        I have 2 tables with a relationship by EmployeeID (Employee, Cases)
The relationship name is Purchases (ie employee->Purchases), and iterating through it gives each row in order by date (entry order perhaps?).
There could be thousands of rows, so I want to present this collection in reverse date order.
Would I have to define a provider or repository to call instead of just Employee->Purchases?
	View 5 Replies
   
  
    
	
    	
    	
        Mar 17, 2010
        If I have a specific order that I want to sort my List by, how do I do that? For instance, I have a list of items (coming from a database), with ID's ... and they come in order, i.e 1, 2, 3, 4. After receiving this list, I'd like to reorder the list above based on a specific order, e.g. 2, 4, 1, 3. How do I do this without complicate it too much?
	View 11 Replies
   
  
    
	
    	
    	
        Oct 26, 2010
        I have a function in sitefinity that returns a list of categories.
//return list of categories
private IList<ICategory> GetCategoryDataSource() {
var cntManager = new ContentManager(CaseStudyManager.DefaultContentProvider);
IList allCategories = cntManager.GetCategories();
List<ICategory> filteredList = new List<ICategory>();
foreach (ICategory category in allCategories) {
filteredList.Add(category);
}
return filteredList;
}
What I want to know is how to sort this list.
Categories in Sitefinity are as far as i can tell just a string, there are no other fields associated with a category. Therefore I have nothing to sort the categories on, other than appending each category with a number, like:
1 - Legal
2 - Financial
3 - Property
When these categories are displayed on the website I can then at least trim the parts i need.
	View 2 Replies
   
  
    
	
    	
    	
        Dec 30, 2010
        I'm attempting to use the List Reorder from here: [URL] I've got all the scripts in place, and my events are firing properly on dragging/dropping, but I'm unable to see anything in my object. The goal is to reorder the list, and save the new order back to the DB. I am assuming something is wrong with my syntax in the lists.bind, as it shows the actual items in the list, but the values are empty.
$(document).ready(function () {
var options = {
itemHoverClass: 'itemHover',
dragTargetClass: 'dragTarget',
dropTargetClass: 'dropTarget',
useDefaultDragHandle: true
};
var lists = $('.lists').ListReorder(options);
var items = [];
lists.bind('listorderchanged', function (evt, jqList, listOrder) {
for (var i = 0; i < listOrder.length; i++) {
items[i] = $("ul li:eq(" + i + ")").attr('id');
}
});
$('#btnSave').click(function () {
if (items.length > 0) {
var jsonText = JSON.stringify({ items: items });
$.ajax({
type: "POST",
url: 'ManageSliders.aspx/SaveReOrder',
data: jsonText,
contentType: "application/json; charset=utf-8",
dataType: "json",
success: function () { $("#result").html("New order saved successfully"); },
failure: function (msg) { alert(msg); }
});
}
else {
alert("You have made no changes");
}
});
});
I'm binding a listview using C# and that is showing up fine as well.
<ul class="lists">
<asp:ListView ID="lvSliders" runat="server">
<LayoutTemplate>
<asp:Panel ID="itemPlaceHolder" runat="server" />
</LayoutTemplate>
<ItemTemplate>
<li id='<%# DataBinder.Eval(Container.DataItem, "Id")%>'>
<%# DataBinder.Eval(Container.DataItem, "Title")%></li>
</ItemTemplate>
<ItemSeparatorTemplate>
</ItemSeparatorTemplate>
</asp:ListView>
</ul>
I ran it through Fiddler, and it is throwing me this error:
{"Message":"Cannot convert object of type u0027System.Stringu0027 to type u0027System.Collections.Generic.List1[System.String]u0027","StackTrace":"   at System.Web.Script.Serialization.ObjectConverter.ConvertObjectToTypeInternal(Object o, Type type, JavaScriptSerializer serializer, Boolean throwOnError, Object& convertedObject)
at System.Web.Script.Serialization.ObjectConverter.ConvertObjectToTypeMain(Object o, Type type, JavaScriptSerializer serializer, Boolean throwOnError, Object& convertedObject)
at System.Web.Script.Services.WebServiceMethodData.StrongTypeParameters(IDictionary2 rawParams)
at System.Web.Script.Services.WebServiceMethodData.CallMethodFromRawParams(Object target, IDictionary2 parameters)
at System.Web.Script.Services.RestHandler.InvokeMethod(HttpContext context, WebServiceMethodData methodData, IDictionary2 rawParams)
at System.Web.Script.Services.RestHandler.ExecuteWebServiceCall(HttpContext context, WebServiceMethodData methodData)","ExceptionType":"System.InvalidOperationException"}
	View 3 Replies
   
  
    
	
    	
    	
        Jan 31, 2011
        I was just after some help to put the following code into a loop.  I have 6 div's with id's ImgDetails1 - ImgDetails6 and 6 buttons
with id's 1 - 6
if 1 is pushed it should hide the other divs but ensure div1 is shown.  the same applies for every other
div.
I can do this the long way writing logic for each div but I am not the best with js and have failed
at each attempt to put the code in a 1 - 6 loop to hide all divs except the one selected and make sure that is shown.
[Code]....
	View 4 Replies
   
  
    
	
    	
    	
        Jan 18, 2010
        I have an ASP.NET website application, and there is a home page for my web site. I need to be able to change the default document of my website programmatically (C#) so that I can  make another web page take priority above the one that already exists. I would then like to revert back to the previous default document order.
Example :  
I have two home pages - Home1.aspx and Home2.aspx. In the IIS default document settings I have added the two pages and made Home1.aspx be the first default document then Home2.aspx the second. I need in some cases to be able to change the order of the two default documents so that Home2.aspx is the first default document then Home1.aspx the second.
How can I do that from my C# code?
	View 3 Replies
   
  
    
	
    	
    	
        Jan 5, 2010
        I am trying to correct the sort order of my ASP.NET drop down list.
The problem I have is that I need to select a distinct Serial number and have these numbers organised by DateTime Desc.
However I cannot ORDER BY DateTime if using DISTINCT without selecting the DateTime field in my query.
However if I select DateTime this selects every data value associated with a single Serial number and results in duplications.
The purpose of my page is to display data for ALL Serials, or data associated to one serial. When a new cycle begins (because it is a new production run) the Serial reverts to 1. So I cannot simply organise by serial number either.
When I use the following SQL statement the list box is in the order I require but after a period of time (usually a few hours) the order changes and appears to have no organised structure. 
	View 2 Replies