Selecting One Day / Week / Month From Sql Server Timedate?
Mar 29, 2011
I have data saved in a sql server database which i am using to draw a graph with in asp.net (c#) one field is an INT and the other is a datetime At the moment the graph is only drawing for all the data in the table i was wondering if there is any way to add into the sql string a statement that says for only today or this week or this month.
this is my sql string at the moment:
SelectCommand="SELECT [Time], [Temp] FROM [test2] ORDER BY [Time]"<br>
the format that the datetime is in is "2011-03-29 00:46:06.377"
need sql statements to retrive the records which addbefore one week ,two week,one month and two month depend on the date column in databaase i want to retrive the records which add before week and so onany one can help me how i doing this
Im struggling to find week start and week end date based on week number of the year. I have written this following sql to calculate that but it fails when year is 2012... The logic should count week number starting from first monday of the year. But it gives me wrong start date and end date when year is 2012, 2018....
I have to come up with a way to get data from a SQL server table given it's month
There's a smalldatetime type field called "date" in the "events" table and a field from it looks like this:
29/01/2003 17:00:00
It should be one among those that appear in the gridview when I select jan/03 in a given DropDownList control in ASP.NET.
What would be the best way to do this? Assuming I only want to go as long as 10 years to the past, wouldn't making a dictionary be a good way?
How do I change it so the top month is always the current, and each month another options appeaars in the dropdown ?
It should be a common issue, so that shall not be a trick, but I want a good and clean way of doing this, and (since I'm new to asp.net) I myself would come up with something messy after a long time trying.
So what I want is:
1) Select
2) Best way of populating DropDownList (with the current month always at the top)
3) Best way to bind the DropDownList user-friendly way of writing months to the select query-friendly way of writing datetimes
i wnat to ask a question, i have two calender control and 3 dropdown as one has in its item : 1st, 2nd, 3rd, 4th second has in its item : monday, tuesday....sunday
Third has in its item : month, 2nd month, 3rd month, 6th month.
i wnat to do that if i select 1st form first dropdown, monday from second dropdown and month from third dropdown between two calender control's date i want 1st monday of each month.
if i select 2nd in 3rd dropdown then i want 1st monday of alternative month.
I want to select a day of the week say .. Tuesday. I want all Tuesdays of that month (or between two selected dates) to get selected automatically. I am ready to use Calendar control or DropDownList whichever would do the trick.
I have a application where in on selection of Month and year, the datagrid should be display, username and the dates, the username and number of leaves from the database. UserName 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19..
Sam P P Susi U P - Planned Leave U - Unplanned Leave
In database i have only Username, leave start and end date.
1.How to display the dates in column in datagrid based on month and year selection.
2.How to map the dates in the datagrid with the start and end date from sql server database
I am learning jQuery. Here I have a requirement i.e I have to add Week number and Week ranges of a year to Drop-down List in ASP.NET3.5. And I have to pass selected week range to database. I am using c#.net. This should be done automatically for every year.
I have a working timesheet which displays on a webpage, what I was also wanting was to display the previous week and the following also on the same page. I will attach both the .aspx page and the aspx.cs page. I have hardcoded the date into the webpage just for ease of reference at the moment.
how to get the start and end dates of the week by passing in a week number? I have a dropdownlist that needs to show 2010-05-17 - 2010-05-23 and I need to determine this date by passing in a week number.
Ex: if I pass the number 20, it will return 2010-05-10 - 2010-05-16 etc...
My dropdownlist will always only show one week and it will always be the previous week from the currect week.
how can i get the actual date through that date's datepart and calendar week? Its means that , i have Calendar week = 1 and datepart is Friday, so i will the actual date is 01-JAN-2010?
I have to insert YEAR WEEKNUMBER STARTDATE ENDDATE values to a datatable( say weekrange). If I pass 2011 as year
WEEK RANGE STARTS FROM '2011-03-28 ' TO '2011-04-03'.(Because in my database 2010 last week range endds with '2011-03-27')
Like this I have to generate for 52 weeks.
I want to write a stored procedure, that takes only year as parameter. with this year I have to generate week ranges and insert into my table as shown above.
I have events that have start and end dates and I want to display the current week that the event is in progress. To currently do this I am finding the week of the end date and subtracting the week of getdate(). This works unless the event goes into the next year and then it returns 0 .Here is my sql
course_status_1 = CASE WHEN GETDATE()[code].....
What I need to happen is for an event with start date and end date in differnet years to calculate what week of the event get date is currenty in.
I have projects table which have project starting date and end date in datetime() format.every project have some report day which is friday and saturday(which is fixed),the problem is i want to show which project is falling in this week's reports, i think i have to compare project starting date and ending date with this week dates...so i have create function in sql to get week date... but i don't know how can i show...i am totally confused
How to display the number of days in textbox when the month is selected in the dropdown list,,,for example if i select the month december ,after selection i want to display 31days in the textbox how ?