AJAX :: Calendar Width / Display Only 5 Days Instead Of 7 Days?
Feb 26, 2011
I am facing a different problem in using Ajax Calendar..
i.e., I am using ajax calendar properly
but whenever i am click calender image it displays ajax calender only 5 days instead of 7 days...
The preview of calendar is shown below
[URL=http://www.lazypic.com/view.php?filename=56ScreenShot.jpg][img]http://www.lazypic.com/images/56ScreenShot.jpg[/img][/URL]
View 3 Replies
Similar Messages:
Dec 7, 2010
There is a calendar control in asp.net
For selection mode, there is day, dayweek and dayweekmonth.
But I wanna select randomly like every monday for the selected month.. something like that.
For that, I need to do the custom method.
View 1 Replies
Jan 19, 2011
I need to be able to only allow certain days to be selected on a calendar extender. I have an application where I need users to run a report. The report has to be for a certain time length (2 weeks, from a sunday like 11/2/2011 to a saturday like 11/15/2011). Is there a way to accomplish this?
View 6 Replies
Dec 6, 2012
How to calculate no of days, month and working days
from date
Date1 is Enrolled date
Date 2 is todays date
So I want to calculate no of days and month and working days excluding saturday and sunday
Date1 = 10/01/2012
date = 12/05/2012
I want ans as : total days : 65 days
Month : 2 month 5 days
working days : 48 working days
View 1 Replies
Jan 31, 2011
I would like to get number of Year, Month and Days by Given days.
Eg:- My input is 400 out put like as 1 year 1 Month and 4 Days.
How to do it?
View 5 Replies
Mar 29, 2011
I am working with radcalender. it displays all months of the year. In any calender month it displays around 42 days. I dont want to display more than 31 days in any month.
View 1 Replies
Jul 19, 2010
I have a calendar for day view, month view and week view. In month view all the days in the particular month (month which user selects) will be displayed in a grid. Suppose if a month begins by wednesday/thursday then the cells of monday, tuesday remains blank. Instead I need to display last two days of previous month and similarly if the month ends on monday/tuesday then the remaining cells should be filled with starting dates of succeeding month. pls provide code for this functionality.
View 1 Replies
Apr 7, 2010
How to do it. For example the calendar for march will also show days from feb and april. I dont want them to be shown. How to do. Anyone have sample code?
View 1 Replies
Feb 9, 2011
I have in a report @StartDate and @EndDate but the thing that I want to know if it is possible to do is: if I select in @StartDate = 01/03/2011 that in @EndDate only can select the days until 01/09/2011 and the day after that can't be selected (disabled)
View 2 Replies
Jan 13, 2010
I want to count the number of days from selected days.I am having 2 calendar control on the form.I am selecting a dates from each calendar and passing values to textbox1 and textbox2.Suppose i am selecting 13/01/2010 from calendar1 and 18/01/2010 from calendar2. I want to count the number of days and display as 6.
View 5 Replies
Jan 22, 2010
how to keep selected multiple days in calendar control?
View 2 Replies
Apr 26, 2010
I'm trying to create a calendar control that is linked to a SQL database.
The meaning is to create an event calendar were the user can put in his info at a reservation page.
After filling everything in, the info is stored in a table on the database, the users must give in a start date of there reservation and an end date.
Now, I got everything to work so far, the calendar reads everything from the database, show it on the calendar and stuff... But only the first day.
I now what code to use for showing the first date, but I have no idea how to show the end date and all the days between.
Also the meaning is that when a person puts in a reservation, the background of the cell turns orange for "pending status", when the owner of the building agrees the color turns red for "reserved - not available"
This is the code I use for showing the dates:
[Code]....
View 2 Replies
Jan 12, 2011
So the asp:calendar control... I am able to place linkbuttons on the calendar to a specific date just fine. I'm a little lost on how to have the linkbutton stretch across multiple days. Vehicle is scheduled and now admins that use the app would like to see on a calendar the requests shown from start date to end date. Here is where I'm at.
[Code]....
The information should start on Jan 6 and end on Jan10.
View 7 Replies
Jan 12, 2013
i have a dropdownlist in my asp.net+vb web. i want to display current date and 5 previous dates.(eg if today is 12 jan 2013 the dropdownlist should display 08 Jan 13 to 12 jan 13. my code is in vb
View 1 Replies
Dec 4, 2013
I want one column Category having values Travelling,Food,Air Fare,Auto Rental in gridview.Now I want date and day as header for next columns and I can insert record datewise in grid. I want it as following image.
View 1 Replies
Feb 27, 2013
I am trying to create to a college time table, I am not sure how to display calendar date and day in GridView header. Also, how to display editable time in the time table .
View 1 Replies
Feb 12, 2010
I would like to know if it is possible to highlight some days in the calendar extender, for example the weekends, the holidays.. Or if I should use the calendar of asp.
View 3 Replies
Jul 30, 2013
Found this very useful [URL] .....
How do we allow only past 7 days for selection along with disabled future date.
View 1 Replies
Dec 11, 2012
How to display the number of days in textbox when the month is selected in the dropdown list,,,for example if i select the month december ,after selection i want to display 31days in the textbox how ?
View 1 Replies
May 7, 2015
How to show current date along with six days as a week in html header with navigation bar for next week and previous week?
View 1 Replies
Sep 6, 2010
I want to display time on Y axis and days on x axis.
I want to dispaly 12:00 AM,11:00 AM...11:59 PM. on Y axis.I want function to create sequence like that and on X axis display week like 6-sep,7-sep,..11-sep.
View 6 Replies
Oct 7, 2010
i'm trying to make this work for several days but it just doesn't work.
this is my code:
aspx page:
[Code]....
webservice:
[Code]....
this was downloaded from this website.
the problem is that the page loads fine but no autocomplete occurs.
View 5 Replies
Feb 3, 2010
I have enddate with dropdown, the dropdown values like this 3months,6months,9months, 1 years, 2years.....etc. my start date is now date .
so how can i get days difference between from startdate and selectedperiod?
View 3 Replies
Jun 2, 2010
If I were to run some code, perhaps send an email, every 30 days to users of my site, how would that be done?
View 5 Replies
Feb 3, 2010
how to get days difference between two dates in asp.net
View 3 Replies