How To Control The TimeZone Of Events Returned By The Google Calendar API
Oct 27, 2010
I have the following code for use in my asp.net website:
CalendarService service = new CalendarService("mycalendar");
EventQuery query = new EventQuery();
query.Uri = new Uri(group.GroupEventsURL);
query.SingleEvents = true;
query.SortOrder = CalendarSortOrder.ascending;
query.ExtraParameters = "orderby=starttime";
query.NumberToRetrieve = 50;
query.TimeZone = "America/Chicago";
EventFeed feed = service.Query(query);
Which produces the following URL:
[URL]
According to the documentation (emphasis mine), I expect the Times in each EventEntry to be in the Central time zone:
The current timezone. If not specified, times are returned in the calendar time zone.
Times in the resulting feed will be represented in this timezone.
Replace all spaces with underscores (e.g. "ctz=America/Los_Angeles").
But my server is hosted in Arizona, so (for now) all of the dates on the calendar are two hours earlier than they should be. Am I doing something wrong? How do I get the dates in the feed to be in the Central time zone even though the server is in Arizona?
I do not plan on moving my hosting any time soon, but since Arizona does not participate in Daylight Savings Time, I cannot simply add two hours to every date.
View 1 Replies
Similar Messages:
Sep 10, 2010
I've written a entry form for our company employees to enter marketing courses into the DB and at the same time add them to a Google Calendar. The Calendar is accepting the events, but the coloration of the event is different from a "manually" entered event using Google's interface. This leads me to believe that there is some property I am not setting that is causing the events not to be show on the calendar once it is embedded in our other company web pages.
The code used to enter events:
// Create a CalenderService and authenticate
CalendarService myService = new CalendarService("exampleCo-exampleApp-1");
myService.setUserCredentials("xxx@gmail.com", "xxxxxx");
CalendarQuery query = new CalendarQuery();
[Code]....
And this is the resulting calendar:
The "test event jasdf event" is the manually entered event, and the two events: "Test event 234" are the programmatically entered events. In any case, once I embed the calendar, the only event showing up is the "test event jasdf".
Anyone faced this issue before or had success with google calendar? If so, I'd like to see what you might have used to successfully create events and publish them.
View 1 Replies
Sep 23, 2010
if i click a date in the calender control events under the clicked date should be populated in the gridview( not for a particular date for all dates in the calender ) in .net
View 3 Replies
May 2, 2010
i just want to use a calendar with events like date selection update,delete,creat events. and i want to do this with sql server 2005. I started my project with webApple.
and the secound, i just cand find whats wrong in this
[Code]....
the problem line is
[Code]....
View 4 Replies
Jan 11, 2010
I have been tasked with designing a scheduling system to fit into an existing application. At present I have a SQL Table - Tasks which have a StartDate and EndDate column.
I have a requirement to set the Task as a recurring task i.e. Replace server backup tapes every day, or, Order more stationary once a month.
I am lost on how to design this. I can't seem to find a proper example on the net. can someone point me in the right direction.
View 1 Replies
Jul 6, 2010
I have a client side JavaScript that generates a date in JavaScript( new Date(2007,5,1)).
I need this date passed through to a hidden field that the code behind can access.
My issue is that when the hidden field is converted into a DotNet datetime, the time is incorrect. This is because the JavaScript is including timezone info from the client browser.
DotNet is then using this info to recalculate the time based on the difference between the server time and the client time.
What i need from the JavaScript is just the year, month and day.
I don't want to pass through 3 int values to my code behind as this will be a major change to the whole app.
What is the best way for me to accomplish this?
If i can set a UTC time with no timezone info I think that might work.
View 4 Replies
Mar 10, 2011
I am currently developing an events calendar application using ASP.NET MVC and SQL Server and I would like to know how the slideshow for events works on this site - [URL]
View 2 Replies
Aug 30, 2013
I need to display a calendar in my website which shows different sort of Events when clicked on particular date. My database has start date and end date, news title and news brief. I just want to display news Title on that date and then provide a link to that news brief in different page. How can I do this.
View 1 Replies
Jul 7, 2010
I'm looking to build a Google like calendar from scratch. I need it to be flexible, so if someone has an appointment scheduled and is running 15 minutes let, I need to be able to click a button and move that appointment and all the other appointments underneath it down by 15 minutes.
View 2 Replies
Sep 14, 2010
integration of Google Calendars in the website? I need to replace the existing calendar control in the website with the Google calendar. I am trying to merge the events with Google Calendar so that events are posted/ tracked in Google Calendar, and events added to the Google Calendar would be shown in my website. I want some working sample which will provide me some idea to integrate the Google calendar in the website.
View 1 Replies
Oct 2, 2010
I have been racking my brain for a few days trying to get a list of calendars from Google using DotNetOpenAuth. I can successfully get a list of contacts using the DotNetOpenAuth Samples. I have integrated it with my domain using the OpenId+OAuth. Everything works great to get a list of contacts.
So from there I modified the code to try to retrieve a list of Calendars and I keep getting a 401 Unauthorized error. I know it is authorizing because I can get the contact list. Does anyone have a code example how they are retrieving calendars or calendar events using the DotNetOpenAuth with Google???
[Code]....
View 2 Replies
Jan 28, 2011
Having a lot of problems getting to grips with the Kentico CMS, but I'm finally getting somewhere close. I'm using a normal portal engine and running Kentico 5.5 RC2 on a local installation. I currently have an events page which uses a repeater to display all of the events that are available on the system currently. I want to use a calendar to be able to filter the events in that repeater. How would I go about this?
View 1 Replies
Jan 14, 2010
If anyone is using the Day Pilot Lite Calendar, Is there a way we can add the color for individual events
I founf this link, but it
[URL]
View 1 Replies
Mar 15, 2010
I was just wondering if someone could help me. I would like to have an event calendar system whereby I have an XML document containing a list of events, with <Title><Date><Description> and <URL> nodes. I have bound them to a data source.What I want now is to add a calendar to the page, so when a user selects a particular month a list of all the events in that particular month are listed in date order.
View 1 Replies
Aug 14, 2010
I have embedded a Google Calendar Reminder button into an aspx page. It assumes the date is in a yyyyddmm format. So that 08/14/2010 in my text box needs to be converted to 20101408 What would be the format to take a date (string) from a textbox and convert it into a string will be in the desired format for Google?
View 2 Replies
Dec 23, 2015
I am using jquery fullcalender..
I want to bind Events to each days of the calender dynamically from the json return by the ajax method..
View 1 Replies
Mar 31, 2010
What would you recommend me to do in order to accomplish that?I'm developing a Scheduling software and i love google's interface (view in day, week, month) but i'm thinking in doing everything from ground zero. Is there a way to use pre-created controls or something much more easy than my idea ?
It's for web with asp.net and c#.
View 2 Replies
Jul 15, 2010
Currently, I am using Calendar control on ASPX page. Instead, I want to use AJAX Calendar Extender control because of the animation effect and the way it moves between years making if much more impressive than Calendar control.Is it possible to display Calendar extender on page permanently, just like Calendar control?
View 2 Replies
Oct 16, 2010
How to wire up HTML server controls events?
I added a Input (Text) control in my web form and turned it into an HTML server control so its an instance of HtmlInputText class.
If I double click on the control It only adds a OnClick event handler method inside the script tags in the HTML doc of the web form but how to I get to handle its Serverchange event exactly? does VS.net 2008 has no ability to auto wire up the event to the control, do I have to manually wire up the event handler?
View 3 Replies
Nov 24, 2010
I've got two websites. One is a copy of the other, I even went ahead and remade a copy of the original a second time hoping it would alleviate the issue I'm having but it didn't.
On both pages I have a calendar so the route is
Csharp Code:
[code]....
The issue is on the original site /Calendar works. It shows the Calendar page with the current month. On the copy site /Calendar gives a 404 but /Calendar/Index shows the Calendar page with the current month.
View 1 Replies
Dec 7, 2010
I am developing an active x control for IE which is invoked through javascript. The active x control is developed in visual basic and it an array of strings. How will I use this array of strings in javscript.
Eg :-
var a = new Array()
a = objActiveX.GetArray(); // call to active x returns array of string, how will I loop through this in javascript. The above line does not work.I want to loop through each string in javascript.
View 1 Replies
Aug 9, 2010
I'm trying to use the Calendar control in a local intranet enviroment, so I need to put all the Javascript files locally, I've downloaded the Ajax Control Toolkit 40412 source code and extracted the Scripts from
"..AjaxControlToolkit_9c860ac12ae9SampleWebSitesAjaxClientWebSiteScripts",so I write the following code
[Code]....
View 3 Replies
Jan 11, 2011
i create new composite control to make a full calendar control.
[Code]....
All is good until i put
[Code]....
View 2 Replies
Oct 14, 2010
I have a Calendar Control that I added text that show scheduled meetings on certain dates and it works okay.
The problem is that when I click on a date I need to http to another web page or sometimes goto a web page in the same web site. The problem is when the code that creates the hyperlink runs it replaces the text displaying "meetings" scheduled for that date instead appending the link to the date and retaining the "meetings" text that was already there.
Below is how I set that up with the code that adds the meetings followed by the url code that replaces the meetings text:
[code]...
or any other kind of link in my Calendar Control without clobbering whatever was in there? If it is not possible is there another way to link to another page after a date in the Calendar Control is clicked?
View 6 Replies
Jan 12, 2010
I have a calendar control in which i am loading data from db using the below method.
[code]...
What i want to achieve is in the selection changed event of the calendar.I would like to access the calendar selected cell value.I tried to look for a event in the selection changed method but unable to come up with any.Let me know if anyone came across this and able to access the value in the selected cell control value.
View 3 Replies