Data Controls :: How To Change Order Of GridView Columns
Oct 8, 2013how to change order of grid view column,after binding it through database in asp.net web application
View 1 Replieshow to change order of grid view column,after binding it through database in asp.net web application
View 1 RepliesHow to change GridView columns order or index during runtime.
View 2 RepliesIn gridview boundedField, some Departments are listed like:
CIT
Customer Change Mind
Customer Issues
Logistics
Regional Engineering
Regional Sales
Can I change the order like:
Regional Sales
Regional Engineering
CIT
Logistics
Customer Issues
Customer Change Mind
I mean to say the list will not be on Asc or Desc. May I change order as per my own list order?
How can I change gridview templatecolumn order dynamically?
View 4 Repliesi want to change the color of border rows and columns in the grid view in asp for printing purpose.
View 1 RepliesI have a gridview which makes use of a datasource. The columns are auto-generated.
Right now, my task is to make the first column into a url column. Does anybody know how to do it?
I have a gridview that loads with a new datasource on button click event. On the gridview (which is located in a table columm incidentally) are 2 columns, a descriptor and a checkbox. The problem is that after postback, the column widths change, the checkbox column expands and the other column contracts. Is there a way to keep the gridview column sizes the same after postback?
View 2 RepliesI am trying to add dynamically gridview (headerstylewidth, back-color, height, etc…, itemstyle width, back-color, height, etc…), in codebehind but I am receiving this error:
Index was out of range. Must be non-negative and less than the size of the collection. Parameter name: index
See the code:
<asp:GridView
runat ="server"
ID="gridview1"
Height="175px"
Width="750px"
GridLines="Both"
onRowDatabound="gvdata_onRowdataBound">
[CODE]..
I've got a tough one (at least for me!). I have a gridview control which is actually from ComponentOne but most is the same as the normal gridview. It has a feature that lets me move columns around so they are in different order. I want to be able to click a button and see the order of these columns and which ones are visible. This is to be used for a custom report I am generating.
Does anyone know how to find out what columns are visible and in what order? I'm doing it in VB coding for asp.net.
How is it possible to change the displayed order of columns from a DataTable?
For example, dataTable "dt" contains two columns "a" and "b". I bind it to a GridView like this:
gridView.DataSource = dt;
gridView.DataBind();
But I'd like the GridView to display "b" first (leftmost).
Important point: I'm using this to export to Excel and there's no actual output to screen, using:
HtmlTextWriter htw = new HtmlTextWriter(sw);
gridView.RenderControl(htw);
I have the follow grid
<asp:GridView ID="dgParticipante" runat="server" AllowPaging="True"
The AjaxToolkit has a ReorderList. I'm searching for a jQuery solution that does the same and found this page. I would like to change the order of divs (vertically) and upload the new order to the database (ajax).
View 2 Repliesin asp.net page user able to select gridview Columns, and it will hide remaining columns and that selection done by check box with column list bellow is Image link , what exactly I am looking for [URL] it look bellow after selection of column done [URL]
View 1 RepliesI'm trying to use images representing arrows to allow the user to change the order in which items appear in a list in a grid view in ASP.NET.
I have a class which has a value named "position", the class is displayed inside the GridView and is ordered by position. In each of the rows of the gridview are an up and down arrow which i want to change the value of "position" for the object represent by the row of the gridview. Whats the easiest way to do this?
[Code]....
Here's my gridview when it comes it it's sorts on Age. Sorting is available for all columns/headers. How do I make the sort order to change on the ddsrpt sort to desc order when it's clicked?
<asp:GridView ID="GridView1" runat="server" AutoGenerateColumns="False"
DataSourceID="SqlDataSource7" EnableModelValidation="True" Width="789px"
CaptionAlign="Top" Height="126px" BackColor="White" BorderColor="#DCBE68"
BorderStyle="Solid" BorderWidth="1px" CellPadding="4"
HorizontalAlign="Center" CellSpacing="2" Font-Names="Arial"
AllowSorting="True" EmptyDataText="No Records" DataKeyNames="FO,CLMSSN">
[Code] ....
I got this error message - Gridviewsortdirection is not declared
I have a gridview that was quite easy to setup and pull all the reqested database info from an object data source in my BLL. However for the life of me I cannot get any of the columns to change there widths. If I change the columns footer, header, and item style to something around 50px or as large as 5000px it will not change whatsoever. The gridview width as a whole is left blank. Currently I have a phone number column that is the default column size that is overflowing the entire grid. Is there some trick to adjusting column widths in a gridview? It should be as simple as going to the smart tag, editing columns, and changing each ones style to the width I want?
View 4 RepliesI have two table Order and Order Detail.
What i need is i need to bind last 10 Order in Gridview/details view with paging, and the same order detail also fetch from database and shown in another gridview.. if user click any oderNo in first Gridview/DetailView then i need to show Respective order detail in anther gridview..
without postback coz we already fetch 10 order with orderdetails from the database..and if user click next 10 orderNo using paging then again we need to load 10 orderNo with respective orderdeatils from database like this going on....as well as let me know how to take print of particular oder and order detail....?
How can I change the treeview layout to display the data in colums orizontal instead of displaying them in a vertical manner?
View 4 RepliesI have a gridview and I would like to be able to programatically change the HeaderText of it's columns (probably in the DataBinding event). I know this can normally be achieve with something like this:
myGrid.Columns[0].HeaderText = "My Header Text";
However, the gridview in question is actually nested within another gridview (via template column). So I can't access it directly. I'm trying to use the FindControl method to access it, but so far that isn't working.
I found this article on how to manipulate the rendering sequence of asp.net controls.: [URL]I placed some placeholders on the page to encapsulate the controls i want to move around. The problem is, that RenderChildren does render the controls without the html i placed into the placeholder like this:
<asp:PlaceHolder id="phOneToMove" Runat="server" Visible="true">
<tr>
<td><asp:Literal id="label1" Runat="server">Caption</asp:Literal></td>
<td>
<asp:TextBox ID="textbox1" runat="server"></asp:TextBox>
</td>
<td>
<asp:RequiredFieldValidator ID="validator1" Enabled="true" ControlToValidate="textbox1" runat="server" EnableClientScript="False" ErrorMessage="error"></asp:RequiredFieldValidator>
</td>
</tr>
</asp:PlaceHolder>
The controls are rendered without the tr and td around.How can I handle this? All I want is to change the order of the placeholders like in this example phOneToMove.
I'm binding a gridview from a webservice with 30 columns and 10 rows, I need to print the same in a PORTRAIT, for that i decided to display columns as rows and
rows as columns like below:
EMP1 1 2 3 4
EMP2 1 2 3 4
I am using dropdownlist to select whether the gridview should be filled by data arranged in ascending order or descending order with Gridview Paging. The problem i am encountering is that when i fill the data in ascending order it works fine but when i arrange the data in descending order the first page loads fine but the other pages are not filled properly in paging.
View 1 RepliesAfter I complete an order and return to my products area my shopping cart still shows the items that were ordered. I have checked the database and the items are not there anymore. somehow my code is remembering the data.
View 3 RepliesI want that all my others GridViews be like this (the only thing that change is the data content):
dont forget that this has already some behaviours because of the pagination for example that i want to maintain in all others GridViews.
What I have is a command column with 2 link buttons, Review and Update. The Review link will show a more in depth look at the record (pretty much a detailsview) The Update link will allow the user to edit a few select fields. The Update link works fine, because I put the code in the GridView3_SelectedIndexChanged event. When I click the Review link (which has code in the LinkButton1_Click event), there is no data from the Selected row, because the row is not yet selected. Is there a way to trigger the selection BEFORE the button click event? It seems like this should be easy, but I haven't needed to do this before.
View 3 Replies